INSTALLATION – NEW BUILDING

1

montaz_2


Put in demarcation stakes to mark the path of the edging.

Install the edging and secure its position using the planted stakes. Gently push it into the ground.

2


3


Pour in the soil to fix the edging in its position. It will be more stable during filling.

Fill in the soil. Leave 4-5 cm for filling with gravel or stone aggregate.

4


5


Place the geotextile and remove anchoring elements.

Fill in and leave a 1-2cm gap between the fill and the upper edge of the garden edging.

6


7


Installation after sowing of grass. Final installation.

});